For more information on accessibility, access procedures and deadlines, see our Training page.
CQI-11 – Evaluation of special surface treatment processes: the method – #2511
Context
- You wish to understand the applicable customer requirements according to the CQI-11 self-assessment manual (AIAG) on the control of the special surface treatment process and the self-assessment rules.
Objectives
- Understand the specific requirements of customers demanding CQI-11.
- Discover the contents of the CQI-11 manual (self-assessment tables, job audit, etc.).
- Identify the key points in the manual.
- Learn how to use the self-assessment questionnaire in the CQI-11 manual through a case study on technical aspects.
Recommanded for
- Quality / QHSE managers, engineers and technicians.
- Quality engineers.
- Methods engineers.
- Internal auditors.
- Customer of a supplier subject to CQI-11.
Prerequisites
- Understanding how a surface treatment plant works.
Pedagogy
- The teaching method alternates between theoretical sequences on the requirements of the CQI-11 manual and application sequences through a case study on the technical aspects.
Evaluation mode
- Knowledge test (MCQ).
Course materials
-
Participant file containing the presentations delivered during the training and the exercise materials.
To go further
Trainings :
-
CQI-11 – Evaluation of special surface treatment processes: practical application on site – #251
Consulting services : EURO-SYMBIOSE can assist you in the concrete implementation in your company. Contact us to know more about it.
General Introduction.
Section 1: Management responsibility and quality planning.
Section 2: Responsibility for ground handling and materials.
Section 3: Pyrometry.
Process Table A: Zinc and zinc alloys.
Process Table H: Hydrogen embrittlement treatment.
Process Table D: Decorative coating of plastic substrates.
Process Table I: Process control and verification and calibration of test equipment.
Section 4 of the PSA: Job audit.
